Job-shop scheduling problem with energy consideration - Université Clermont Auvergne Accéder directement au contenu
Article Dans Une Revue International Journal of Production Economics Année : 2019

Job-shop scheduling problem with energy consideration

Résumé

These days, rising energy costs along with general concerns about major environmental issues (global warming, climate change), result in more and more strict production constraints for the industrial sector, which is known to be the first energy consumer and greenhouse gas emitter in the world. There is therefore a growing industrial need to address the problems of production systems related to energy aspects.In this paper, a job-shop scheduling problem with energetic aspects is considered. The objective is to minimize production costs in terms of energy, while respecting a power peak limitation, along with more traditional production constraints. Two integer linear programming models are proposed for the addressed problem. In order to evaluate and compare the performance of these formulations, computational experiments are presented and numerical results are discussed and analysed.
Fichier principal
Vignette du fichier
S0925527319301173.pdf (723.63 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)

Dates et versions

emse-02115819 , version 1 (22-10-2021)

Licence

Paternité - Pas d'utilisation commerciale

Identifiants

Citer

Oussama Masmoudi, Xavier Delorme, Paolo Gianessi. Job-shop scheduling problem with energy consideration. International Journal of Production Economics, 2019, 216, pp.12-22. ⟨10.1016/j.ijpe.2019.03.021⟩. ⟨emse-02115819⟩
254 Consultations
121 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More